Locally produced power in Briksdal

Briksdal mini power plant

Briksdal Minikraft was commissioned with one turbine in 2007. In 2012, we received a license to expand production with an additional turbine. This was commissioned in 2017. This way, we have maintained our green, short-haul power for many years.

Turbine 1

Owner: Briksdalsbre Fjellstove AS
Launched: 24.05.2007
Pipeline length: 590 m
Drop: 62 m
Turbine: Francis
Annual production: 1.4 GWh
Max production power: 250 kw

Turbine 2

Supplier: Energi Teknikk AS, Rosendal
Launched: 18.05.2017
Annual production: 1.1 GWh
Max production power: 260 kw
Turbine: Francis

Total production both turbines

Turbine 1: 1.4 GWh
Turbine 2: 1.1 GWh
Total both turbines: 2.5 GWh

Suppliers

Design/construction management: Nordplan AS, Stryn
Generator/turbine, total package: Energi Teknikk AS, Rosendal
Digging/laying pipes: Yri Sand AS, Loen
Pipes/hatches: Brødrende Dahl AS
Concrete work: Kåre Bøe, Stryn
Concrete delivery: Stryn Betong AS, Loen
Electricity: Øvreberg Installation AS, Strynaft

 

The inlet to the power plant is located about 250 m behind Fjellstova towards the glacier. The end station is located about 240 m below Fjellstova under the lower parking lot. We have full production in the summer and somewhat reduced in the winter.